چکیده :

Although project management has long been under consideration and various methods have been proposed for timing projects, but they have not been completely responsive to the needs of the project for increasing productivity and customer satisfaction. As a result, increased risks and the incompatibility of the project with the initial Base line plan, necessitate using modern techniques (such as CCPM) as opposed to common methods (such as CPM). And, the cautiousness, and often resistance, of project control users made the researcher implement two of the selected techniques in the breakdown of a petrochemical project – which is a national plan – in the design, supply, and production (EPC) phases, using the results of fundamental research, to evaluate – based on known indicators – and gain better knowledge of the tools. For ranking the indicators, Analytical Hierarchy Process (AHP) was used, and to analyze the methods and implement them, software facilities for project control, such as Primavera6 and CCPM+ were used. Results indicate that there is a philosophical difference between the two approaches, and the reason is using CC in the limitations theory and buffers that cause concentrating on system efficiency and performance and making rules and algorithms, not discussed by the crisis path. Finally, although the use of CC is complex and requires cultural changes, many ideas can be easily utilized by experienced project managers and become an appropriate competitor for CPM in reducing project time and expense.

کلید واژگان :

Keywords: CCPM, CPM, Project Management and Control



ارزش ریالی : 300000 ریال
دریافت مقاله
با پرداخت الکترونیک