چکیده :

The prediction of tunnel boring machine (TBM) performance in a specified rock mass condition is crucial for any mechanical tunneling project. TBM performance prediction in accurate may reduce the risks related to high capital costs and scheduling for tunneling. This paper presents a new model/equation based on gene expression programming (GEP) to estimate performance of TBM by means of the penetration rate (PR). To achieve the aim of the study, the Pahang–Selangor Raw Water Transfer tunnel in Malaysia was investigated and the data related to field observations and laboratory tests were used in modelling ofPR of TBM. A database (1286 datasets in total) comprising 7 model inputs related to rock (mass and material) properties and machine characteristics and 1 output (PR) was prepared to use in GEP modelling. To evaluate capability of the developed GEP equation, a multiple regression (MR) model was also proposed. A comparison between the obtained results has been done using several performance indices and the best equations of GEP and MR were selected. System results for the developed GEP equation based on coefficient of determination (R2) were obtained as 0.855 and 0.829 for training and testing datasets, respectively, while these values were achieved as 0.795 and 0.789 for the developed MR equation. Concluding remark is that the GEP equation is superior in comparison with the MR equation and it can be introduced as a new equation in the field of TBM performance prediction.

کلید واژگان :

Tunnel boring machine · Penetration rate · Gene expression programming · Multiple regression



ارزش ریالی : 600000 ریال
دریافت مقاله
با پرداخت الکترونیک