Designing an advanced available-to-promise mechanism compatible with the make-to-forecast production systems through integrating inventory allocation and job shop scheduling with due dates and weighted earliness/tardiness cost
نویسندگان : Masoud Rabbani Mina Monshi Neda Manavizadeh Moeen Sammak Jalali
In the competitive business world, applying a reliable and powerful mechanism to support decision makers in manufacturing companies and helping them save time by considering varieties of effective factors is an inevitable issue. Advanced Available-to-Promise is a perfect tool to design and perform such a mechanism. In this study, this mechanism which is compatible with the Make-to-Forecast production systems is presented. The ability to distinguish between batch mode and real-time mode advanced available-to-promise is one of the unique superiorities of the proposed model. We also try to strengthen this mechanism by integrating the inventory allocation and job shop scheduling by considering due dates and weighted earliness/tardiness cost that leads to more precise decisions. A mixed integer programming (MIP) model and a heuristic algorithm according to its disability to solve large size problems are presented. The designed experiments and the obtained results have proved the efficiency of the proposed heuristic method
کلید واژگان :Advanced Available-to-Promise (AATP) Make-to-Forecast (MTF) Batch /real-time mode ATP Jobshop scheduling Weighted earliness/tardiness cost Inventory allocation
ارزش ریالی : 1200000 ریال
با پرداخت الکترونیک
جزئیات مقاله
- کد شناسه : 1154280685864098
- سال انتشار : 2015
- نوع مقاله : پذیرفته شده در مجلات Scopus ,ISI با 4>IF>
- زبان : انگلیسی
- محل پذیرش : International Journal of Industrial Engineering Computations
- IF مجله :
- ISSN : 1923-2926
- تاریخ ثبت : 1397/08/30 16:57:38
- ثبت کننده : معین سماک جلالی
- تعداد بازدید : 265
- تعداد فروش : 0