چکیده :

Now, the companies and institutions view production management and manufacturing planning systems as one of the aspects raising important competitive advantage for them. This causes that we observe the mentions and new systems in this field. Hierarchy production planning (HPP) is raised as one of the methods. In the past decades, considerable studies have been conducted in this regard. This study attempted to adjust Meibody model of existing models in manufacturing hierarchy planning as the case study of this study based on the existing information of press shop hall 3 of Iran Khordo Company. Then, by collected data of this hall, HPP was implemented and finally by model output analysis, optimal production planning was provided for this hall. Later, HPP model is compared by considering 5 parameters of goal, performance field, content, inputs, process and outputs as theoretical with manufacturing resources planning model (MRP-II) and weaknesses and strengths of each model and performance of each of them are explained compared to other one.

کلید واژگان :

: Hierarchy Planning, Manufacturing resource Planning, Optimal production, Production management



ارزش ریالی : 300000 ریال
دریافت مقاله
با پرداخت الکترونیک