چکیده :

Nowadays the constructional projects executors and designers for unsuigraph designs, technical complexities, the variety of required specifications, huge amount of activities and also the great amount of involved organizations and individuals, they confront with many issued for reaching their aims. Therefore, these projects aren’t done in the frame of time and determined costs frameworks. Value engineering is one of the solutions that by usage of this systematic program and based on team innovation, not only the project reviewed, but also the economy opportunities are identified and emerged by the employers. Unfortunately in some cases this technique is not arranged with needs, features, and the limitations at constructional projects and it can not relieve the problems. In the present article, we tried to determine the weak and strong points, the proceeding opportunities and challenges in value engineering at Iran constructional projects based on surveys and library studies. Finally, the author’s suggestions for optimizing the value engineering are represented.

کلید واژگان :

Value engineering, SWOT analysis, constructional projects, Iran



ارزش ریالی : 500000 ریال
دریافت مقاله
با پرداخت الکترونیک