Risk Management is one of The Basic and Important is one of The Basic and Important Subjects of The Project. So in This Research, First The Risk of South Pars Gas Complex In Iran Will Be Recognized. Then The Wight of Every One of These Standards is ranked in The Method of FAHP and Finally the Ranking of Suggested Options of Research Will Be Considered with the Method of VIKOR. The main criteria for this study include : Financial factors, Factors related to the employer, Management factors and Factors relating to the contract. For each of these criteria Measures intended to As Selected 32 Sub criteria in sum. The results indicate that Fiscal agent with normal weight 0.349, Have The highest priority. Also The best choice As a means of reducing risk, Method of SHA&SSHA, is selected as the preferred option.
کلید واژگان :Project Risk, Risk Management, AHP Method, VIKOR Method, Method of SHA&SSHA
ارزش ریالی : 300000 ریال
با پرداخت الکترونیک
جزئیات مقاله
- کد شناسه : 3143547527155672
- سال انتشار : 2015
- نوع مقاله : پذیرفته شده در سایر مجلات علمی معتبر و علمی مروری و ISC
- زبان : انگلیسی
- محل پذیرش : ISPACS Journals) International Scientific Publications and Consulting Services)
- برگزار کنندگان :
- ISSN :
- تاریخ ثبت : 1394/04/07 11:37:51
- ثبت کننده : مسعود ذوالقدری
- تعداد بازدید : 277
- تعداد فروش : 0